iCAT W Tool Bar Settings: A Quick Guide

Posted by Danny Seddon on Sep 4, 2018 10:44:31 AM
Find me on:

This quick guide will show you the correct way to install a water/liquid cooled harness using the iCAT setting bar (part number 980.2153).

There is also a guide for the air/gas cooled harness.

 

 TIP : Lubricate the o-rings & cable assembly connector first to enable easier installation. 

 

Step  1 

  • Insert the tool bar through the front of the iCAT and robot arm and screw into the cable assembly.

Nissan_iCAT_Tool_Bar_A-320701-edited

Step  2 

  • With the cable assembly correctly positioned, pull it into the module all the way to the end.

Nissan_iCAT_Tool_Bar_B-270143-edited 

Step  3 

  • Nissan_iCAT_Tool_Bar_CWhen fully inserted, the orange o-ring in the tool bar will be flush with the connecting module interface.

 

 

 

 

 

 

 NOTE : When replacing a water/liquid cooled harness, it is important to make sure any coolant residue in the connection module is removed prior to installation.

Thank you once again for reading our blog and I hope you found the information useful. 

DS_Signature.png 

Topics: Robotic Welding, Robotics, Welding Automation, Automation, MIG Welding, icat, cable assembly, Binzel, liquid cooled, Water-cooled, install, installation, how to, harness

Posts by Topic

Show all

Recent Posts

Subscript to Email Updates